SGQ 5.00% 1.9¢ st george mining limited

Ann: New 49,000 Siemens EM Conductor at Mt Alexander, page-264

  1. 6,116 Posts.
    lightbulb Created with Sketch. 1193
    Whatever the reason, at normal DD drill rates ( 30+ m per day with single shift) given 20 days now elapsed from start we should well and truly be past that EM plate. So, either... the drill has deviated and the plate was missed ( in which case may need to run a wedge hole of the mother hole), or the drill has got stuck ( but I think we would have been advised if this happened) or the drill rate is painfully slow due the fault(s). Or we got nothing, but that would seem odd given the strength of the conductor. Still wish we had done a wedge hole off MAD 184 to start with, minimal cost, a few days of wedge drilling would have reached the EM plate for a preliminary "look-see"
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.001(5.00%)
Mkt cap ! $18.78M
Open High Low Value Volume
2.0¢ 2.1¢ 1.9¢ $12.14K 621.0K

Buyers (Bids)

No. Vol. Price($)
3 275919 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 250000 1
View Market Depth
Last trade - 16.10pm 09/05/2024 (20 minute delay) ?
Last
1.9¢
  Change
-0.001 ( 5.00 %)
Open High Low Volume
2.1¢ 2.1¢ 1.9¢ 105956
Last updated 15.51pm 09/05/2024 ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.