last quarterly
BHill production costs 0.94c lb- assume in Aus $
present spot price of Zinc 0.98c-US $(kitco)
margains from beltana stockpile are much higher 0.30c lb
potosi ore grades are going to be much higher
lead price remains near all time highs
margains on Flying Doctor will be higher
hmmm its time to think of PEM and CBH as a combined entity.
add RASP to BHill output
Endeavour about to add higher grades after successful backfill..and then you have CBHs new projects and we have several of these
all this and more for about 27-28c a share
Add to My Watchlist
What is My Watchlist?