IGO 0.76% $5.31 igo limited

Re: Cosmos My Take..A shaft is for a high(er) tonnage project....

  1. 125 Posts.
    lightbulb Created with Sketch. 3
    Re: Cosmos My Take..

    A shaft is for a high(er) tonnage project. IGO wished that was what it would be. But a sprinkling of geotechnical reality showed that the only large stopes they will be mining will be of the self caving type.The only logical option as that point was to stop the CAPEX bleeding and re-look at the sums for a lower tonnage, smaller stope project - which can be done with a trucking fleet. Maybe.
 
watchlist Created with Sketch. Add IGO (ASX) to my watchlist
(20min delay)
Last
$5.31
Change
0.040(0.76%)
Mkt cap ! $4.021B
Open High Low Value Volume
$5.26 $5.39 $5.26 $10.00M 1.881M

Buyers (Bids)

No. Vol. Price($)
17 17916 $5.31
 

Sellers (Offers)

Price($) Vol. No.
$5.33 15386 1
View Market Depth
Last trade - 16.10pm 27/08/2024 (20 minute delay) ?
IGO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.