No issue. Just correcting the expected revenue from AN to pay for PB.
I note that the plant designed Crush, grind, float and filter has capacity up to 800,000 tpa. But note how these four components were mentioned and not the plant as a whole.
"The plant has the capacity to treat more that 500,000tpa of ROM. Once this is realised, the aim
Same presentation said,
will be to increase production from 12,000 to 15,000tpa Copper metal (+25%) before end 2018."
If the capacity of 18,000 tpa was already in-built then what is the explanation of only increasing production to 15,000 tpa by the end of 2018?