Agree Szaba don't take any chances this year, get a positive flow test done then move on if time permits, the damage to Linc's standing on the SGX would be almost catastrophic if we have a repeat of last year, it is obvious SGX retailers are far from convinced of Lincs potential and they would not trust the company for a very, very, very long time if we dont get a result.
PS: Original Drill schedule has the close off date for travailing over Tundra as as May 5 2014 approximately, so that leaves 48 days as from tomorrow
Aprox date because Travel is closed as soon as thawing occurs as designated by the Division of Mining, Land and water. DMLW
Add to My Watchlist
What is My Watchlist?