CTP 2.04% 4.8¢ central petroleum limited

def going to take 7 days - n maybe some more. the wireline &...

  1. 661 Posts.
    def going to take 7 days - n maybe some more. the wireline & wirline sheaves must of got caught up with the drill pipe n the monkey board some how. in my opinion it is a big disaster if the mast is twisted u cant do much with the rig - its not structurally safe.

    This is not CTP's fault this is directly the fault of the drilling contractor and the wireline logging crew
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.001(2.04%)
Mkt cap ! $35.52M
Open High Low Value Volume
4.9¢ 4.9¢ 4.8¢ $47.28K 967.1K

Buyers (Bids)

No. Vol. Price($)
1 517610 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 150000 1
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.