FBR 0.00% 5.0¢ fbr ltd

I heard a rumor that once the first layer is layed, they then...

  1. 1,463 Posts.
    lightbulb Created with Sketch. 708
    I heard a rumor that once the first layer is layed, they then drill a chemical anchored hold down bolt into the slab.

    The next rumor I heard is that they use threaded reinforcement bars at strategic locations throughout the build, followed by a final cavity fill of polycrete.

 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.