NDO 1.83% 83.5¢ nido education limited

new drilling update just out, page-5

  1. 1,012 Posts.
    Opt,

    They won't pull out prior to drilling ahead.

    LOT will take ~2 hours then drilling ahead.

    Say 400m to casing point - should make it easily with one bit at an average of 25 m/hr.

    Should be at next casing point by midnight Tuesday or 6am Wed at the latest.

    p1000
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.