Thanks for the link and the report Prospektor.
I dont know why they are referring to a JV, its the first I have heard about it.
I note they mention a massive reduction in Capex though, which JY alluded too last week. Re do the sums with $25 mill capex instead of the $63 mill. Where does the savings come from?
Maybe there is another co on board, but I would be very surprised as it SHOULD have been mentioned to market by now.
I wonder if they are referring to WDR?
TCG
- Forums
- ASX - By Stock
- new hardmans monthly july out now
Thanks for the link and the report Prospektor.I dont know why...
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add THR (ASX) to my watchlist
|
|||||
Last
1.7¢ |
Change
-0.001(2.86%) |
Mkt cap ! $3.995M |
Open | High | Low | Value | Volume |
1.7¢ | 1.7¢ | 1.7¢ | $893 | 52.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 862297 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 319791 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 862297 | 0.017 |
2 | 1059998 | 0.016 |
4 | 1804900 | 0.015 |
2 | 1020000 | 0.014 |
3 | 637465 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 319791 | 3 |
0.020 | 79893 | 2 |
0.021 | 75875 | 3 |
0.023 | 50000 | 1 |
0.027 | 200000 | 1 |
Last trade - 13.06pm 29/07/2024 (20 minute delay) ? |
Featured News
THR (ASX) Chart |