TLM 7.50% 21.5¢ talisman mining limited

A total of 13 Stage 2 RC and diamond holes have been completed...

  1. 733 Posts.
    lightbulb Created with Sketch. 145

    A total of 13 Stage 2 RC and diamond holes have been completed (DRRC0012 to DRDD0024)
    with assays awaited.

    • Down-hole electromagnetic (DHEM) surveys underway on DRRCD0019 to identify potential
    extensions of the high-grade mineralisation.

    • Stage 3 drilling planned to commence shortly to follow-up the high-grade copper-gold and base
    metals zones once additional assay results and DHEM survey results are returned.

    Other Targets at Durnings

    ■ The large Eastern GAIP Anomaly yet to be tested
    ■ Soil geochemistry completed - assays awaited
    ■ Geological mapping - complete
    ■ Additional geophysical survey PDIP likely before
    drilling
    ■ Area maybe cropped in May…rain dependent

    Exploration commences at Mabel Creek IOCG Project,
    South Australia

    2024 exploration program commences at Talisman’s 100%-owned Mabel Creek IOCG Project
    in SA, acquired by TLM in 2023, with a Ground Gravity Survey underway.
    • Initial 6-8 week survey program covering entire 1,048sqkm holding.
    • Survey covers a number of prospective magnetic anomalies in the Mabel Creek area and will
    be used to generate drill targets for the planned field program commencing in the second half.
    • First on-ground exploration work to be undertaken on this project area for 14 years.

    Wonmunna Iron Ore

    • Royalty cash receipts from the Wonmunna Iron Ore Project of $2.5 million received for the quarter.
    • Talisman remains well-funded with cash on hand at 31 March of $7.2 million.


    Exciting Times for all Talisman Shareholders...



 
watchlist Created with Sketch. Add TLM (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
0.015(7.50%)
Mkt cap ! $40.48M
Open High Low Value Volume
20.5¢ 21.5¢ 20.0¢ $23.64K 115.2K

Buyers (Bids)

No. Vol. Price($)
1 23170 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 7118 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
TLM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.