SVM 2.08% 49.0¢ sovereign metals limited

ONGOING WORK PROGRAM Sovereign’s ongoing rutile work program...

  1. 1,816 Posts.
    lightbulb Created with Sketch. 114
    ONGOING WORK PROGRAM Sovereign’s ongoing rutile work program includes;

    *Continued drilling at the Railroad and Railroad West prospects, which are the largest soil anomalies identified to date. The drilling program will target an initial JORC Resource in these areas

    *Additional drilling to test a number of new regional targets discovered by soil sampling

    *Continued regional soil sampling to identify new rutile targets

    *Commencement of desktop studies to assess applicability of different mining methods

    *Continued metallurgical test-work to confirm the flowsheet developed so far and produce rutile product for marketing purposes.

    We will have a first JORC resource soon. Our market capitalization is ridiculously low. Who sells shares at 9.5c. Crazy. I intend to make a lot of money. Selling shares at 9.5c is the opposite.
 
watchlist Created with Sketch. Add SVM (ASX) to my watchlist
(20min delay)
Last
49.0¢
Change
0.010(2.08%)
Mkt cap ! $275.8M
Open High Low Value Volume
49.0¢ 50.0¢ 48.0¢ $119.4K 244.1K

Buyers (Bids)

No. Vol. Price($)
1 1 49.0¢
 

Sellers (Offers)

Price($) Vol. No.
50.0¢ 9912 1
View Market Depth
Last trade - 15.59pm 03/05/2024 (20 minute delay) ?
Last
48.5¢
  Change
0.010 ( 0.00 %)
Open High Low Volume
48.0¢ 49.0¢ 48.0¢ 10370
Last updated 14.19pm 03/05/2024 ?
SVM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.