92E 0.00% 50.0¢ 92 energy limited

Please do some research;Firstly, they have 5 projects in the...

  1. 12,532 Posts.
    lightbulb Created with Sketch. 1033
    Please do some research;

    Firstly, they have 5 projects in the pipeline and, secondly, no mining entity would ever drill all sites at once - that is simply a preposterous suggestion.

    "92 Energy (ASX: 92E) is gearing up to drill the Gemini project in January where it will test the extent of mineralisation at the GMZ uranium discovery.The program will comprise 6,600m of diamond drilling and follow up on the GMZ discovery hole which intersected 5.5m at 0.12% uranium oxide (1,200 parts per million), including 1m at 0.28% uranium oxide (2,800ppm). This contained a 0.5m sub-interval containing 0.36% uranium oxide (3,600ppm) from 234.5m to 235m.
    92 Energy has also identified a 1.8km-long trend immediately to the north of the discovery hole, which it considers highly prospective and has been named the Gemini Extension target."

 
watchlist Created with Sketch. Add 92E (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.