OEL 7.69% 1.2¢ otto energy limited

They will have no option but to delay Gazzatta-1 now until mid...

  1. 7,611 Posts.
    They will have no option but to delay Gazzatta-1 now until mid next year (if their JVP will allow)... or drop the project .... no way they can sign a Euro4m AFE right now ...imo.

    SALTY
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.