The first 2 production wells (first had already been done) will be drilled to a greater depth to determine the base level and deeper than any prior drilling, to establish the true base. Brine quality will then be tested all the way to the base.
Simon mentioned this in the Dec 2020 quarterly call, would imagine results from this will be included in the SDV update.