Well said surfarosa.
Still a long road ahead, and many hoops to jump before producing.
As a new plant, will subject to many more issues/impediments than GXY (apart from funding) - design refinement / changes, construction delay, budget blowout, wet weather, commissioning and teething issue. A bit of luck, full production possible in 18 months around March / April 2019 ie 2 babies away.
Bumpy ride for the SP for a long, long time as experienced by GXY before.
Enjoy the ride 1959.
- Forums
- ASX - By Stock
- GXY
- New Lithium Triangle
New Lithium Triangle, page-13
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)