Well said surfarosa.
Still a long road ahead, and many hoops to jump before producing.
As a new plant, will subject to many more issues/impediments than GXY (apart from funding) - design refinement / changes, construction delay, budget blowout, wet weather, commissioning and teething issue. A bit of luck, full production possible in 18 months around March / April 2019 ie 2 babies away.
Bumpy ride for the SP for a long, long time as experienced by GXY before.
Enjoy the ride 1959.
- Forums
- ASX - By Stock
- New Lithium Triangle
Well said surfarosa. Still a long road ahead, and many hoops to...
-
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GXY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online