Mirage has been analysed from new 2D+3D seismic data , and intepretation , to occupy 20 sq klms for a 20mmbbloe in place .
The JV : hope through the drilling of Mirages -2,3,4 to prove up recoverable reserves of approx 4.4 - 5.0 mmbbloe.
Production rates from 4 mirage wells and a planned 2-3 more later , looking for >2,000bopd for the JV oilers . [ ITC has 40%]
Widcats like Skyhawk and Tomcat + others can only add to all this .
VPE and RPM are JV oilers with ITC .
dyor
Add to My Watchlist
What is My Watchlist?