See https://www.cefc.com.au/media/files/cefc-finance-to-build-newcastle-solar-farm.aspx
This is the sort of project (eg with CSIRO) that GSL could chase if and when the product comes off a manufacturing line and passes acceptance testing (with assurance through accelerated testing of long life)