AGS 0.00% 17.5¢ alliance resources limited

news : open briefing

  1. 90 Posts.
    1
    Attention ASX Company Announcements Platform
    Lodgement of Open Briefing®
    Alliance Resources Limited
    Suite 3, 51-55 City Road
    Southbank, VIC 3006
    Date of lodgement: 07-May-2008
    Title: Open Briefing®. Alliance Resources. Developing the Four Mile Uranium Project
    Record of interview:
    corporatefile.com.au
    Alliance Resources Ltd (ASX code - AGS) is an emerging uranium and gold
    producer with an advanced uranium project, 8 kilometres from the operating
    Beverley Uranium Mine in South Australia. Can you briefly describe your assets
    and the status of each?
    CEO Steve Johnston
    Alliance has four projects within Australia. Our flagship asset is the 25% equity
    we hold in the Four Mile Uranium Project in South Australia. This discovery was
    made in 2005 and is emerging as one of the most significant high-grade uranium
    deposits in Australia, and possibly globally.
    There are currently two major deposits within the Four Mile project – Four Mile
    East and Four Mile West. Infill drilling is currently being carried out on the Four
    Mile East Project in preparation for a mineral resource estimate and First Stage
    Mining (FSM). In May 2007, we announced an Inferred Mineral Resource at Four
    Mile West containing 32 million pounds of U3O8. Our JV partner with 75% is
    Quasar Resources, an affiliated company of Heathgate Resources, which operates
    the adjacent Beverley Uranium Mine.
    In late April 2008, Quasar announced that it would apply for a Mining Lease
    rather than a Retention Lease over the Four Mile project providing it gets positive
    2
    results from the feasibility study and hydrological and metallurgical studies. That
    would make redundant the previously planned field leach trial and means that
    FSM at Four Mile is now scheduled to commence after the grant of the Mining
    Lease, which is anticipated to be late 2009. This announcement from our JV
    partner reinforces our view that the Four Mile project is a high quality uranium
    project.
    Our next major asset is the Maldon Gold Project of which we hold 100%. The
    Maldon project is also in the pre-development phase and we are advancing an
    exploration decline towards the Alliance South lode, which is a virgin lode within
    the Eaglehawk reef system, so we can access it for trial mining and processing.
    Our remaining assets are both exploration plays. The Warrina copper/gold project
    is at Coober Pedy in South Australia and the other is the East Frome copper/base
    metals Project near Broken Hill, NSW. These projects are both owned 100% by
    Alliance.
    corporatefile.com.au
    Why do you believe the Four Mile uranium joint venture is emerging as one of the
    most significant high-grade uranium deposits in Australia? How does it compare
    with its peer projects in size and grades? Can you explain the access to
    infrastructure and services such as water, power and transport?
    CEO Steve Johnston
    Four Mile is a significant uranium discovery because of its size and its metal
    content. In terms of grade, it is the best “greenfields” discovery since CRAE
    discovered Kintyre in 1985. Four Mile is the third highest grade deposit in
    Australia behind Jabiluka and Koongarra.
    In terms of size, Four Mile is currently ranked number 11 amongst uranium
    deposits in Australia based on the initial resource outlined at Four Mile West last
    year of 15,000 tonnes of contained uranium oxide. However, Alliance sees the
    project as having potential for at least 50,000 tonnes of uranium oxide. If we can
    convert that potential mineralisation - defined by variable-spaced drilling - into
    resources, then it would move Four Mile to number 4 behind Olympic Dam,
    Jabiluka and Yeelirrie.
    Our JV partner, Quasar, is affiliated with Heathgate Resources, which owns and
    operates the adjacent Beverley Uranium Mine. The JV therefore has potential
    access to existing infrastructure including a treatment plant and all associated
    services such as water, power and transport. Heathgate generates its own power
    on site using gas turbines supplied by a branch line connected to the Moomba Gas
    Pipeline which is about 12 kilometres away. In addition to grade, this access to
    infrastructure is what differentiates our project from other uranium projects. Four
    Mile is well placed to move into the development stage.
    3
    corporatefile.com.au
    Earlier this year you announced an Exploration Target Range of 13,500 to 21,500
    contained tonnes (30-47 million pounds) of U3O8 for the Four Mile East uranium
    deposit. This Exploration Target is in addition to the Inferred Mineral Resource
    for the Four Mile West deposit of 32 million pounds contained U3O8. Can you
    explain the basis on how you determined the Exploration Target Range for Four
    Mile East?
    CEO Steve Johnston
    The target range is a conceptual range based on statistical and geo-statistical
    analysis of exploration results up to the end of September 2007. Alliance
    undertook that analysis on its own account to provide the market with an
    assessment of the potential scale of the Four Mile East deposit. The Four Mile
    West and Four Mile East deposits cover an area in excess of 4 square kilometres.
    These are giant deposits and it will take time to drill them. The Exploration Target
    Range was designed to guide the market on the potential size of the Four Mile East
    deposit while we undertake that drilling.
    Specifically, we used four different methods to estimate the Exploration Target
    Range and the final range that we published was the lower and upper range using
    all combined methods.
    corporatefile.com.au
    Can you recap the latest exploration results at the Four Mile East deposit? How do
    these results reinforce or modify your Exploration Target Range?
    CEO Steve Johnston
    The latest results from Four Mile East include 4.4m @ 1.59% pU3O8, 7.1m @
    0.85% pU3O8, 5.5m @ 1.02% pU3O8 and 4.7m @ 0.75% pU3O8. These include
    some of the highest grade-thicknesses drilled at Four Mile East to date and should
    reinforce the Exploration Target Range in my opinion. Note that, “pU3O8” refers
    to the U3O8 grade as estimated from Prompt Fission Neutron logging.
    corporatefile.com.au
    Earlier this year you also announced the summary conclusions from the “Four
    Mile Project Concept Evaluation Study” provided by Quasar Resources. What
    were the objectives and major conclusions of the study, including the project scale
    and design envisaged? How will the JV progress Four Mile to a possible
    “Decision to Mine”?
    CEO Steve Johnston
    The objectives of the study were to identify the viable options for developing the
    Four Mile project; principally the possible mining and processing methods. The
    study quickly focused on ISL as the best way to progress the project and it
    examined using the Beverley treatment plant to process the ISL solution from Four
    Mile. That’s a logical approach because the infrastructure is already there.
    The Decision to Mine will be made by Quasar, however Alliance reasonably
    expects Quasar to make that decision in 2008. Once that decision is made, Quasar
    will deliver a feasibility study and we then elect to participate in the project going
    4
    forward which will mean funding our share of project costs from that point. At
    this stage, everything on a technical level looks great and we look forward to
    participating.
    corporatefile.com.au
    Can you give more detail on the In-situ Leach mining method of extracting
    uranium?
    CEO Steve Johnston
    In-situ Leach mining, now known as In-situ Recovery or ISR, is a mining process
    whereby targeted minerals are dissolved in-ground using a network of extraction
    and injection wells. The dissolving reagents are acid or alkaline together with an
    oxidant (at Beverley, hydrogen peroxide). The pregnant solution is then pumped
    to a treatment plant where the minerals are recovered.
    corporatefile.com.au
    Is the ISR mining you will trial similar to that used at Beverley? What similarities
    are there between the Beverley resource and your Four Mile deposits?
    CEO Steve Johnston
    The Beverley uranium deposit is a palaeochannel hosted uranium deposit, whilst
    Four Mile appears to be hosted by blanket sands, so the deposits are different in
    morphology. The host sediments of the two deposits are also a different age.
    Accordingly, the ISR mining methods may be different in terms of
    hydrometallurgy requiring minor changes to well patterns and spacing, however
    we require further studies to determine the final design. Note that at Beverley, the
    wellfields are custom designed for each section of the orebodies, and we expect
    Four Mile to need the same level of customisation.
    At Four Mile East, it is proposed that First Stage Mining will consist of six well
    patterns at 20 metre spacings, although the final number of wells and the spacing
    will be determined by further studies.
    corporatefile.com.au
    The Concept Evaluation Study identified possible processing options as well as
    potential synergies arising from the utilisation of the plant and infrastructure at
    Beverley. What spare capacity is available at Beverley? What adjustments or
    expansions might be needed to accommodate processing of ISR solution produced
    at Four Mile?
    CEO Steve Johnston
    Beverley is licenced to produce 3.3 million pounds (1500 tonnes) of uranium
    oxide per year. It’s my understanding that the plant does not require any major
    modifications to accommodate processing of the Four Mile solution at our initial
    start up rate from First Stage Mining of about 1 million pounds (450 tonnes) per
    annum. As production ramps up, the potential plant modifications may include
    additional resin columns and drying capacity.
    Another reason we’re confident the Beverley plant can process the Four Mile
    solution without major modifications is because preliminary data to date indicate
    5
    that the ore is similar and should result in good recovery of U3O8 at the plant.
    Preliminary bench scale metallurgical test work from Four Mile West samples
    showed recoveries of up to 89%.
    corporatefile.com.au
    Why are you considering a staged development of Four Mile? What size reserve
    might be needed to underpin a development of Four Mile?
    CEO Steve Johnston
    We’re confident that by staging the project it will reduce the capital expenditure
    required to get the project into cash flow.
    In relation to ore reserves, the current JORC guideline for ISR deposits, where the
    Mineral Resource is based primarily on Prompt Fission Neutron (PFN) readings, is
    that no ore reserve should be quoted until the FSM has indicated a stable recovery
    rate. We’re fortunate that our JV partner Quasar is experienced with this type of
    deposit, through its affiliation with Heathgate, and that the existing infrastructure
    at Beverley can be used at relatively modest capital outlay.
    corporatefile.com.au
    What are the potential obstacles to getting into production?
    CEO Steve Johnston
    We are not aware of any technical obstacles to date, but we still need to go through
    statutory approvals at both State and Federal levels to obtain the mining lease and
    other licences. Quasar and Heathgate are experienced with the approvals process
    and they’ll get it done in the shortest possible timeframe. We are grateful that we
    have an experienced JV partner as it would be more difficult going through the
    process by ourselves for the first time.
    corporatefile.com.au
    Can you outline the terms of your free carried interest in Four Mile joint venture?
    What’s your current funding position?
    CEO Steve Johnston
    Alliance and Quasar operate under an Exploration JV. Under that agreement,
    Quasar can make the decision to mine at any time and, as part of the agreement,
    they will nominate a mine development area. However, the area outside that
    nominated area is still governed by the Exploration JV and we will be free carried
    on the remainder of the JV tenements. Quasar will deliver a feasibility study and
    we are free-carried up to its completion.
    Alliance is well funded with about $27.5 million at the end of March 2008. That
    will fund us into first stage production.
    corporatefile.com.au
    Alliance is also developing the Maldon Gold Project in Victoria. What is required
    to get Maldon into production? What are the major obstacles?
    6
    CEO Steve Johnston
    The exploration decline commenced in late 2006 and at the end of March 2008 we
    had advanced 1444 metres, or about 300 metres from our target zone at Alliance
    South. We anticipate we will reach the target zone around August and will then
    cross cut 50 metres to the mineralisation. The objective is to mine bulk samples
    from two different levels from the lode and trial process those through our plant at
    Porcupine Flat, 3 kilometres away. That will give us a good indication of the
    grade of the mineralisation.
    Maldon, like many Victorian gold deposits, is narrow, but high grade. We’ve
    drilled the deposit at Alliance South on 40 metre sections with holes 20 to 40
    metres apart, but the only accurate way to measure the grade is by bulk sampling
    and processing because the gold is nuggety. Statistics indicate that a 30 tonne
    sample is required to get a representative sample of the mineralisation. We’re
    mining a bulk sample of about 5,000 tonnes over two levels, so that should be
    enough to obtain a reasonable indication of the grade of the deposit.
    The major obstacle in getting Maldon into production is the volume of water being
    encountered and water disposal. We have mitigated the water issue by improving
    our practices at the development face because too much water slows down the
    firing cycle. We’ve constructed a 170 megalitre dam which is the largest privately
    owned dam in the district. We have also negotiated a water reuse arrangement
    with the local community and the Shire, enabling farmers to take the recycled
    water for stock use and irrigation. The arrangement is working well and is helping
    the local community, so we’re pretty pleased about that.
    corporatefile.com.au
    There are now many uranium explorers listed on ASX and that number increased
    significantly with a multitude of IPOs in 2007. How do you differentiate Alliance
    from other uranium explorers? In summary, how do you expect to create value for
    shareholders?
    CEO Steve Johnston
    At the peak of the uranium bull market in April 2007, I think there were over 130
    ASX-listed uranium explorers. They are our competitors, but it will be interesting
    to see what happens to a lot of them as their cash reserves dwindle. I think some
    have already run low on cash. We are one of the few, genuine emerging uranium
    producers listed on ASX and we have a substantial cash reserve.
    More importantly, Alliance is differentiated from its peers by the Four Mile
    project, which is emerging as a world class, high grade uranium deposit and our
    JV partner Quasar is affiliated with Heathgate, the owner and operator of the
    adjacent Beverley Uranium Mine. At Four Mile we plan a staged development
    with ISR mining and we expect to be producing 1 million pounds per annum of
    U3O8 at start up in late 2009 with production ramp-up to follow. We have the
    tremendous advantage of having access to the existing infrastructure at Beverley to
    process the mining solution from Four Mile. That, along with the staged
    development, means we will minimise our capital outlay and maximise the cash
    flow from the project.
    7
    The development of the Four Mile project will catapult Alliance from the pool of
    uranium explorers into a top ten global uranium producer. That will create
    tremendous value for Alliance shareholders because, once we’re in production, we
    can be rated by the market on our cash flow generation rather than as an explorer.
    We expect to see a large re-rating at that point underpinned by the quality of the
    Four Mile project.
    corporatefile.com.au
    Thank you Steve.
    For further information on Alliance please call Steve Johnston on (03) 9697
    9090.
    To read other Open Briefings, or to receive future Open Briefings by email, please
    visit www.corporatefile.com.au
    DISCLAIMER: Corporate File Pty Ltd has taken reasonable care in publishing the information contained in this Open Briefing®.
    It is information given in a summary form and does not purport to be complete. The information contained is not intended to be
    used as the basis for making any investment decision and you are solely responsible for any use you choose to make of the
    information. We strongly advise that you seek independent professional advice before making any investment decisions.
    Corporate File Pty Ltd is not responsible for any consequences of the use you make of the information, including any loss or
    damage you or a third party might suffer as a result of that use.
 