OAR 0.00% 0.2¢ oar resources limited

“With the laboratory back up and running at its original...

  1. 264 Posts.
    lightbulb Created with Sketch. 70
    “With the laboratory back up and running at its original capacity, our turn-around time for the detailed XRD analysis for halloysite will return to the nominal 4 weeks. We have prioritised these samples with the laboratory, so that we can finalise our next phase of air-core drilling which will be designed to define the extents of this new zone and enable us to move toward generating an initial resource estimate for the Gibraltar Project.
 
watchlist Created with Sketch. Add OAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.