MGX mount gibson iron limited

New project generation, page-5

  1. 2,274 Posts.
    lightbulb Created with Sketch. 445
    As part of the Midwest Shared Infrastructure Initiative, Verbec have been contracted for a feasability study for a shared slurry line between Mullewa and Geraldton. The study is looking at 3 alternatives for the pipeline, 30, 60 and 90 mtpa.

    Green Steel WA have partnered with the Italian company, Daniela, to commence building a green steel plant at Geraldton. Daniela have expertise in building green steel plants. To fast track the he plant it will initially use readily available natural gas and switch over to green hydrogen when green hydrogen becomes economical.

    Since FEX took up an interest in the magnetite deposits at Byro, their have been discussions with GSWA to build a pellet plant at Mullewa, again using the already available natural gas with plans to switch over to green hydrogen when green hydrogen becomes economical.

    The distinct large crystal size of Fe3O4 found in Midwest magnetite means less costly benefication (crushing and magnetic separation) as it does not need to be crushed down to a fine powder.

    Last edited by Goodheart: 20/12/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
26.5¢
Change
0.000(0.00%)
Mkt cap ! $312.5M
Open High Low Value Volume
26.5¢ 27.0¢ 26.0¢ $276.1K 1.040M

Buyers (Bids)

No. Vol. Price($)
3 123858 26.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 391562 7
View Market Depth
Last trade - 16.10pm 17/06/2025 (20 minute delay) ?
MGX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.