i must be missing something on this one because i cant for the life of me understand any price rise. Its one hole, 700m+ down.. and the grades, whilst huge, are over the tiniest of lengths. The chances of this ever becoming more than a few drill holes must surely be negligible? Perhaps someone can enlighten me as to what i am missing.
- Forums
- ASX - By Stock
- new project
i must be missing something on this one because i cant for the...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)