I read this being 15mill lbs with further testing in the 1-3 area for a further 3-5 mill lbs thats not including area 4 In addition to the mineral resource estimates presented in Table 1, broad spaced sampling
suggests the presence of additional mineralisation within Areas 1 to 3 with potential for a
further 8-12 million tonnes at an average grade of 140-180ppm U3O8 (2-5 million pounds
U3O8).
I read this being 15mill lbs with further testing in the 1-3...
Add to My Watchlist
What is My Watchlist?