Here's the link to the upcoming NS#1 drilling program located 61 kms off Newcastle.
http://www.dpi.nsw.gov.au/__data/assets/pdf_file/0005/365027/Asset-Energy-PEP11-EP-Summary-Nov-10.pdf
Map is on page 9.
-----------------------------------------------------
Quick Translation:
- Drill 36" hole to 169-213m
- Drill 26" hole to either 213-310m
- Drill 17.5" hole to either 310-350m (at this point they'll install the BOP & do the usual pressure testing b4 commencing drilling to TD.
- Drill 8.5" hole to TD of 826m,
Should be a quik drill.
NS#1 co-ords in deg.decimal r as under,
Lat: -32.930469, Long: 152.373633
As of this moment, the Patriot is 242 kms from this location. Should get there by early Monday morning (apprx. 2-3 am, by my estimates).
So should see an update on Monday abt the rig arriving onsite & begining rigup.
Hope the OP continues its good run (from the Kipper wells for Esso, not sure abt SE LongTom-1).
All the best chaps.
- Forums
- ASX - By Stock
- new seaclam-1 drill program
Here's the link to the upcoming NS#1 drilling program located 61...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.236M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MMR (ASX) Chart |
Day chart unavailable
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
SPONSORED BY The Market Online