With reference to the Project Execution Update, while the mill name plate is 2.4 mtpa the ball and sag mills have been upgraded, from 3.8 mw, to 4.4 mw allowing for a potential increase in throughput, from 2.4 mtpa, to 2.8 Mt pa with the addition of a 7th cil tank. Using the project grade of 1.11 g/t, rough calcs produce an increase in gold production of 13,000 oz pa, or a increase to the bottom line of A$31 mil without to much impact on AISC. These are only back of envelope calcs so please verify.
While this in itself is impressive the real star of the show is the project strip ratio of 4.1 to 1. This is even better in the first 4 years of production.
All of this, together with the metallurgy of the ore, points to a project with so much potential.
- Forums
- ASX - By Stock
- GPR
- new sprott note
new sprott note, page-27
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.17M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 120000 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 89000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 120000 | 0.024 |
1 | 450000 | 0.023 |
3 | 1477271 | 0.022 |
2 | 1448571 | 0.021 |
4 | 675000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 89000 | 1 |
0.027 | 22173 | 1 |
0.029 | 898309 | 2 |
0.030 | 151800 | 2 |
0.031 | 100000 | 1 |
Last trade - 16.12pm 13/09/2024 (20 minute delay) ? |
Featured News
GPR (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online