The current mine plan for Woodlark is ~ 28.9 Mt of Ore at 1.12g/t Au. The plant design has been based on a nominal capacity of 2.4 Mtpa of the Woodlark ore type through the processing plant, resulting in 967koz of Gold recovered.The treatment plant design incorporates. Primary jaw crushing to produce a coarse crushed product.
A SAB milling circuit comprising a SAG mill and a ball mill in closed circuit with hydrocyclones;Gravity gold recovery and treatment of concentrate by cyanidation and electrowinning;A CIL circuit to leach and adsorb gold onto carbon;An AARL elution circuit, electrowinning and gold smelting to doré;Dewatering of CIL tails slurry.
Tailings slurry pumping via overland pipe to a deep sea tailings placement facility.
- Forums
- ASX - By Stock
- new sprott note
The current mine plan for Woodlark is ~ 28.9 Mt of Ore at...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $20.97M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 85000 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 488934 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 85000 | 0.022 |
1 | 496583 | 0.021 |
3 | 450000 | 0.020 |
2 | 126000 | 0.019 |
5 | 2517528 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 488934 | 1 |
0.027 | 374086 | 4 |
0.028 | 749629 | 3 |
0.029 | 898309 | 2 |
0.030 | 193478 | 2 |
Last trade - 16.12pm 08/08/2024 (20 minute delay) ? |
Featured News
GPR (ASX) Chart |
Day chart unavailable