GPR 0.00% 2.3¢ geopacific resources ltd

The current mine plan for Woodlark is ~ 28.9 Mt of Ore at...

  1. 851 Posts.
    lightbulb Created with Sketch. 130
    The current mine plan for Woodlark is ~ 28.9 Mt of Ore at 1.12g/t Au. The plant design has been based on a nominal capacity of 2.4 Mtpa of the Woodlark ore type through the processing plant, resulting in 967koz of Gold recovered.The treatment plant design incorporates. Primary jaw crushing to produce a coarse crushed product.
    A SAB milling circuit comprising a SAG mill and a ball mill in closed circuit with hydrocyclones;Gravity gold recovery and treatment of concentrate by cyanidation and electrowinning;A CIL circuit to leach and adsorb gold onto carbon;An AARL elution circuit, electrowinning and gold smelting to doré;Dewatering of CIL tails slurry.
    Tailings slurry pumping via overland pipe to a deep sea tailings placement facility.
    Last edited by Oppdigger17: 16/10/21
 
watchlist Created with Sketch. Add GPR (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.000(0.00%)
Mkt cap ! $20.97M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 85000 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 488934 1
View Market Depth
Last trade - 16.12pm 08/08/2024 (20 minute delay) ?
GPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.