FBR 2.27% 4.3¢ fbr ltd

I'd dare say there's all sorts of jigs that could be developed...

  1. 352 Posts.
    lightbulb Created with Sketch. 39
    I'd dare say there's all sorts of jigs that could be developed to move bricks across at height safely. There are so many subsidiary problems that emerge with HX that will require resolving during mainstream implementation, all of them probably easily resolved. One obvious matter I've commented on before is applying higher strength floor leveller along sections of the build footprint to pre-lasered tell tails, just needs a simple 2 to 3 cm dam any unskilled labourer could lay down. Maybe there are other ways to address the very level slab/surface required.
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
-0.001(2.27%)
Mkt cap ! $207.4M
Open High Low Value Volume
4.4¢ 4.5¢ 4.2¢ $415.2K 9.649M

Buyers (Bids)

No. Vol. Price($)
7 598479 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 71840 2
View Market Depth
Last trade - 15.28pm 14/10/2024 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.