I'd dare say there's all sorts of jigs that could be developed to move bricks across at height safely. There are so many subsidiary problems that emerge with HX that will require resolving during mainstream implementation, all of them probably easily resolved. One obvious matter I've commented on before is applying higher strength floor leveller along sections of the build footprint to pre-lasered tell tails, just needs a simple 2 to 3 cm dam any unskilled labourer could lay down. Maybe there are other ways to address the very level slab/surface required.
- Forums
- ASX - By Stock
- New Video: Build 1
I'd dare say there's all sorts of jigs that could be developed...
-
- There are more pages in this discussion • 326 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.3¢ |
Change
-0.001(2.27%) |
Mkt cap ! $207.4M |
Open | High | Low | Value | Volume |
4.4¢ | 4.5¢ | 4.2¢ | $415.2K | 9.649M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 598479 | 4.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.3¢ | 71840 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 598479 | 0.042 |
16 | 2450804 | 0.041 |
15 | 984608 | 0.040 |
11 | 472342 | 0.039 |
7 | 1441056 | 0.038 |
Price($) | Vol. | No. |
---|---|---|
0.043 | 71840 | 2 |
0.044 | 632715 | 6 |
0.045 | 523117 | 8 |
0.046 | 1315786 | 6 |
0.047 | 679362 | 6 |
Last trade - 15.28pm 14/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, Managing Director & CEO
Charles Armstrong
Managing Director & CEO
SPONSORED BY The Market Online