KEY FEASIBILITY STUDY OUTCOMES
The DSO Feasibility Study demonstrates strong project economics. Key outputs include:
Table 1: Wonarah DSO Project Base Case Results
Metric Unit Base Case
BPH Lumps Product Sales Kt 180
BPH Fines Product Sales Kt 271
BPH Product Price7 A$/tonne 308
APH DAPR Product Sales Kt 225
APH Product Price A$/tonne 100
Project Operations Months 23
Capital Investment A$M 11.5
Total Free Cash Flows A$M 27.3
Average Product Price8 A$/tonne 238.6
All-in Sustaining Cost A$/tonne 181.3
Total Cash Revenues A$M 161.3
Total Cash Operating Costs A$M 122.5
Payback Period9 Months 14
Commenting on the results of the Feasibility Study, Executive Chairman, Brett Clark stated:
- Forums
- ASX - By Stock
- AEV
- News: AEV Avenira Receives Mining Authorisation For Direct Shipping Ore Operations
News: AEV Avenira Receives Mining Authorisation For Direct Shipping Ore Operations, page-16
-
- There are more pages in this discussion • 365 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online