AEV 0.00% 0.9¢ avenira limited

News: AEV Avenira Receives Mining Authorisation For Direct Shipping Ore Operations, page-16

  1. 5,218 Posts.
    lightbulb Created with Sketch. 2062
    KEY FEASIBILITY STUDY OUTCOMES
    The DSO Feasibility Study demonstrates strong project economics. Key outputs include:
    Table 1: Wonarah DSO Project Base Case Results
    Metric Unit Base Case
    BPH Lumps Product Sales Kt 180
    BPH Fines Product Sales Kt 271
    BPH Product Price7 A$/tonne 308
    APH DAPR Product Sales Kt 225
    APH Product Price A$/tonne 100
    Project Operations Months 23
    Capital Investment A$M 11.5
    Total Free Cash Flows A$M 27.3
    Average Product Price8 A$/tonne 238.6
    All-in Sustaining Cost A$/tonne 181.3
    Total Cash Revenues A$M 161.3
    Total Cash Operating Costs A$M 122.5
    Payback Period9 Months 14
    Commenting on the results of the Feasibility Study, Executive Chairman, Brett Clark stated:
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.