FAR 0.00% 50.5¢ far limited

News alert - CNE - Senegal SNE-6 Appraisal Well Result, page-23

  1. 16,201 Posts.
    lightbulb Created with Sketch. 3804
    So now we have,

    SNE-3
    Upper reservoir gross [15m] with 4000 bopd + gross [20.5m] [2 zones] co-mingled 500 bopd
    = 4500 bopd

    SNE-5
    Upper reservoir gross [18m], S480 sand= 2500 bopd stable+ [8m] S460 sand 1400 bopd stable
    =3900 bopd

    SNE-6
    Upper reservoir 1a- [11m] 3700 bopd, 1b- [12m] 900 bopd
    = 4600 bopd

    So the upper reservoir sands have tested 3 locations with, 4500, 3900, 4600 bopd with an average of
    4333 bopd.
    Given these flow results are around 50% of SNE-2 combined flow rate, I think its pretty clear given the area these sands cover, and that SNE 6 is connected then the resource upgrade will be significant IMO. DB
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.