So now we have,
SNE-3
Upper reservoir gross [15m] with 4000 bopd + gross [20.5m] [2 zones] co-mingled 500 bopd
= 4500 bopd
SNE-5
Upper reservoir gross [18m], S480 sand= 2500 bopd stable+ [8m] S460 sand 1400 bopd stable
=3900 bopd
SNE-6
Upper reservoir 1a- [11m] 3700 bopd, 1b- [12m] 900 bopd
= 4600 bopd
So the upper reservoir sands have tested 3 locations with, 4500, 3900, 4600 bopd with an average of
4333 bopd.
Given these flow results are around 50% of SNE-2 combined flow rate, I think its pretty clear given the area these sands cover, and that SNE 6 is connected then the resource upgrade will be significant IMO. DB
- Forums
- ASX - By Stock
- News alert - CNE - Senegal SNE-6 Appraisal Well Result
So now we have, SNE-3 Upper reservoir gross [15m] with 4000 bopd...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $46.66M |
Open | High | Low | Value | Volume |
50.5¢ | 50.5¢ | 50.5¢ | $14.48K | 28.69K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5356 | 50.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
51.0¢ | 59999 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5356 | 0.505 |
2 | 30878 | 0.500 |
1 | 30000 | 0.495 |
2 | 28930 | 0.480 |
2 | 70000 | 0.475 |
Price($) | Vol. | No. |
---|---|---|
0.510 | 59999 | 2 |
0.525 | 69690 | 1 |
0.530 | 30000 | 1 |
0.535 | 30000 | 1 |
0.540 | 52471 | 2 |
Last trade - 15.44pm 12/07/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |