MAY 3.13% 3.3¢ melbana energy limited

thoughts - Alameda Logging finished 21/4 - Alameda Casing gets...

  1. 7,926 Posts.
    lightbulb Created with Sketch. 1535
    thoughts

    - Alameda Logging finished 21/4

    - Alameda Casing gets jammed between 2500m and 3600m as packer gets jammed fragile and damaged well bore. Remedial measures taken and sidetrack instigated and readied for drilling onwards +4weeks. 19/5

    - 200m-600m drill and set and cement new casing in Alta Vega. Continue drilling 3655m core 30/5

    - 80m drill finished 6/6

    - 3743m core finished 10/6

    - 3835m drilled to TD 15/6

    - Logging finished 19/6

    - Liner finished 25/5
    upload_2024-5-17_3-9-4.png
    ssomething like this.

    Business as usual.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.