Drilling at Sefaatli in 2014 returned high grade intersections including 2.5 metres at 2,150ppm eU3O8, 6.2 metres at 810ppm eU3O8, 4.3 metres at 930ppm eU3O8 including 0.5 metres at 2,240ppm eU3O8.
News: Anatolia Energy is now drilling at the Sefaatli uranium project
Add to My Watchlist
What is My Watchlist?