In the meantime, I've been looking into the map and think the slurry pipeline from Zinnwald side would absolutely make sense so that single processing plant can be utilized for both German and Czech side of the resource. It's at the same/similar altitude and the distance is short (maybe <3km):
Zinnwald could supply ore for 10-20 ktpa lithium hydroxide and if Cinovec can be sending ore with two shifts at 2x29 ktpa rate then the joint project could be in the range of 70-80 ktpa. That will make the economics of the whole project even better and should be a no-brainer for EU!
- Forums
- ASX - By Stock
- News and Answers Coming
In the meantime, I've been looking into the map and think the...
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EMH (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.0¢ |
Change
0.015(9.68%) |
Mkt cap ! $35.26M |
Open | High | Low | Value | Volume |
16.0¢ | 17.0¢ | 16.0¢ | $4.697K | 27.69K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 15625 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 23715 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 15625 | 0.160 |
4 | 78020 | 0.150 |
1 | 20695 | 0.145 |
5 | 57000 | 0.140 |
4 | 76229 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 23715 | 1 |
0.175 | 580 | 1 |
0.185 | 100000 | 1 |
0.200 | 1800 | 1 |
0.210 | 18403 | 1 |
Last trade - 10.51am 01/11/2024 (20 minute delay) ? |
Featured News
EMH (ASX) Chart |