May 12 (Reuters) - Siemens Gamesa Renewable Energy SA SGREN.MC :
- TO SUPPLY HYBRID PLANT IN THE PHILIPPINES FOR BERKELEY ENERGY, REDUCING FOSSIL FUEL USE IN A REMOTE LOCATION
- HAS SIGNED A 5-YEAR MAINTENANCE CONTRACT FOR PLANT OPERATIONS WHICH CAN BE OPTIMIZED REMOTELY USING ITS ENERGY MANAGEMENT SERVICE
- PLANT EXPECTED TO BE COMMISSIONED IN THE SECOND HALF OF 2020; ADDITIONAL 10 MW WIND FARM FACILITY IS UNDER NEGOTIATIONS
- HYBRID PROJECT MANAGES EXISTING 16 MW WIND POWER FACILITY WITH BATTERY STORAGE INTEGRATED THROUGH CO'S HYBRID PLANT CONTROLLER
Source text: https://bit.ly/2WpQcUl
SGREN.MC
- Forums
- ASX - By Stock
- BKY
- News: BKY Siemens Gamesa To Supply Hybrid Plant In The Philippines For Berkeley Energy
BKY
berkeley energia limited
Add to My Watchlist
0.00%
!
53.5¢

News: BKY Siemens Gamesa To Supply Hybrid Plant In The Philippines For Berkeley Energy
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
53.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $238.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 181 | 52.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
53.5¢ | 10000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 181 | 0.525 |
1 | 2884 | 0.520 |
2 | 70000 | 0.500 |
1 | 18000 | 0.495 |
1 | 50000 | 0.490 |
Price($) | Vol. | No. |
---|---|---|
0.535 | 10000 | 1 |
0.540 | 12136 | 1 |
0.550 | 2299 | 1 |
0.560 | 4582 | 1 |
0.570 | 25000 | 2 |
Last trade - 16.21pm 08/08/2025 (20 minute delay) ? |
BKY (ASX) Chart |
Day chart unavailable