BRU 3.80% 8.2¢ buru energy limited

Fitzroy River Bridge Kimberley Region - Bridge replacement We...

  1. 26,805 Posts.
    lightbulb Created with Sketch. 4582
    Fitzroy River Bridge Kimberley Region - Bridge replacement

    We are continuing to investigate options for low-level floodway crossings to restore connectivity when river conditions permit. It is expected that the crossings will be capable of taking all vehicles across the river, reinstating access to the East Kimberley while operational.

    … we’re also reviewing options for the installation of a second temporary crossing, approximately 150 metres upstream of the bridge, which is more suitable for higher traffic volumes, including freight vehicles, during the dry season. It is hoped that this crossing will be operational by May 2023

    https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/regional/fitzroy-river-bridge/
    Last edited by CEOChair: 02/03/23
 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.