CE1 calima energy limited

News: CE1 Calima Energy Announces Leo Program Production Update

  1. 193,698 Posts.
    lightbulb Created with Sketch. 2825

    Jan 5 (Reuters) - Calima Energy Ltd (CE1) :

    • DURING THIRD WEEK OF DEC, PRODUCTION LEVELS EXCEEDED 3,800 BOE/D AT THE 3 LEO WELLS
    • ON DEC 23, LEO 3 ENCOUNTERED DOWNTIME EVENT REQUIRING A WELL INTERVENTION WHICH COULD NOT BE RESOLVED UNTIL 3 JAN
    • ONCE LOAD IS FULLY RECOVERED, LEO 1 EXPECTED TO RESULT IN PEAK PRODUCTION OF 450-550 BOE/D
    • LEO 2 EXPECTED TO PRODUCE AT STABILIZED OIL CUT OF 55%, EXPECTED TO RESULT IN PEAK PRODUCTION OF 450-550 BOE/D AFTER FULL RECOVERY LOAD
    • LOAD RECOVERY FOR LEO 1 IS ESTIMATED TO TAKE 90 DAYS
    • LEO 3 EXPECTED TO PRODUCE AT STABILIZED OIL CUT OF 75%, EXPECTED TO RESULT IN PEAK PRODUCTION OF 500-600 BOE/D AFTER FULL LOAD RECOVERY
    • LOAD RECOVERY FOR LEO 3 IS ESTIMATED TO TAKE 120 DAYS
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.