The PV strips get built into the glass so get installed with the window, If a company was to just fit strips, then they would need to be installed on brackets outside the building after the Building was certified as completed.
The PV stips in the Glass with Clearvue, means you can have PV strips all over the building in the glass so its fully sealed and built with the construction, so dosnt need to be done later after the Building has its final inspection.
- Forums
- ASX - By Stock
- CPV
- News: CPV Clearvue Technologies Signs OEM Supply Agreement With BeyondPV Of Taiwan
News: CPV Clearvue Technologies Signs OEM Supply Agreement With BeyondPV Of Taiwan, page-70
-
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPV (ASX) to my watchlist
|
|||||
Last
48.0¢ |
Change
-0.065(11.9%) |
Mkt cap ! $116.4M |
Open | High | Low | Value | Volume |
54.0¢ | 54.0¢ | 47.0¢ | $851.9K | 1.714M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 14499 | 48.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.0¢ | 15757 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 14499 | 0.480 |
1 | 14902 | 0.470 |
1 | 7523 | 0.465 |
1 | 7523 | 0.460 |
2 | 10523 | 0.455 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 15757 | 3 |
0.505 | 7104 | 2 |
0.545 | 5120 | 2 |
0.550 | 14495 | 2 |
0.555 | 1064 | 1 |
Last trade - 16.10pm 16/07/2024 (20 minute delay) ? |
Featured News
CPV (ASX) Chart |