DEL 2.50% 4.1¢ delorean corporation limited

Having built two small biogas plants, I learnt that there is a...

  1. 4,670 Posts.
    lightbulb Created with Sketch. 271
    Having built two small biogas plants, I learnt that there is a fair amount of energy required for preparation and selection of the feedstock material. If it operates on waste then there will be unsuitable material in the brew that can cause problems. Also the material to be digested needs to have its surface area increased by munching it up finely. Failure to do so can result in inadequate digestion or blockage of digesters and storage holdings. This all takes energy and transportation. if the system is continuous, some labour can be saved, but with incomplete digestion, while batch feeds will produce around 30 days of gas (depending on temperature and brew contents. The resulting spent sludge is excellent fertilizer with the nitrogen locked into it because of the anaerobic digestion and should become part of the income stream.
 
watchlist Created with Sketch. Add DEL (ASX) to my watchlist
(20min delay)
Last
4.1¢
Change
0.001(2.50%)
Mkt cap ! $8.845M
Open High Low Value Volume
4.1¢ 4.1¢ 4.1¢ $205 5K

Buyers (Bids)

No. Vol. Price($)
1 24999 4.0¢
 

Sellers (Offers)

Price($) Vol. No.
4.5¢ 15763 1
View Market Depth
Last trade - 15.53pm 14/06/2024 (20 minute delay) ?
DEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.