Pardoo Nickel Project-Company completed a down-hole, versatile-time-domain electromagnetic (VTEM) survey for two holes, to further test the potential for nickel sulphide mineralisation at depth and possible highgrade (>1% Ni) mineralization targets. Results are expected to be announced in November.
PHASE 2 DRILLING COMPLETED AT PARDOO on 8 September 2022 (almost 2 month ago)The Phase 2 RC drilling program comprised 20 new drill holes for a total of 4157 m, bringing the total number of metres drilled by the company at Highway to 34 RC drill holes for a total of 5865m. Results from the Phase 2 drilling are expected to be announced in December and contribute towards a new JORC 2012 Mineral Resource Estimate to be completed early 2023. See below for technical details.
We can expect news any day DYOR.