MTL 20.0% 0.2¢ mantle minerals limited

News Flow/Announcement

  1. 103 Posts.
    lightbulb Created with Sketch. 12
    Pardoo Nickel Project-
    PHASE 2 DRILLING COMPLETED AT PARDOO on 8 September 2022 (almost 2 month ago)
    Company completed a down-hole, versatile-time-domain electromagnetic (VTEM) survey for two holes, to further test the potential for nickel sulphide mineralisation at depth and possible highgrade (>1% Ni) mineralization targets. Results are expected to be announced in November.
    The Phase 2 RC drilling program comprised 20 new drill holes for a total of 4157 m, bringing the total number of metres drilled by the company at Highway to 34 RC drill holes for a total of 5865m. Results from the Phase 2 drilling are expected to be announced in December and contribute towards a new JORC 2012 Mineral Resource Estimate to be completed early 2023. See below for technical details.

    We can expect news any day DYOR.
 
watchlist Created with Sketch. Add MTL (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(20.0%)
Mkt cap ! $12.39M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $402 201.0K

Buyers (Bids)

No. Vol. Price($)
60 130419890 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 63313228 71
View Market Depth
Last trade - 14.44pm 31/05/2024 (20 minute delay) ?
Last
0.3¢
  Change
-0.001 ( 25.0 %)
Open High Low Volume
0.3¢ 0.3¢ 0.2¢ 2004480
Last updated 12.03pm 31/05/2024 ?
MTL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.