LNR 0.00% 0.3¢ lanthanein resources ltd

"As of the 17th July they had drilled 170metres in the first...

  1. 551 Posts.
    lightbulb Created with Sketch. 6
    "
    As of the 17th July they had drilled 170metres in the first hole at Andewa. Work had stopped at that time as a belt has broken and was being repaired. (all spares on kept onsite, so no real delay)."

    Sorry thats quite funny. That aside looks good project.
 
watchlist Created with Sketch. Add LNR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.