Nov 28 (Reuters) - Conocophillips Australi
- CONFIRM LNG VESSEL DOCKED AT APLNG LNG FACILITY LOST POWER AND WAS UNABLE TO LEAVE TERMINAL AS SCHEDULED
- NO INJURIES TO PERSONNEL ON THE VESSEL OR AT THE LNG FACILITY FROM EVENT
- HAVE ASSESSED FOR SCENARIOS TO BEST MANAGE SUPPLY THROUGH APLNG FACILITY WHILE SITUATION IS BEING RESOLVED
- ORIGIN, AS UPSTREAM OPERATOR, MAINTAINING SUPPLY TO DOMESTIC MARKET BUT IS REDUCING FLOW OF GAS TO LNG FACILITY
- FOCUSED ON ENSURING SAFE OPS AND CONTINUE TO SUPPORT SHIP MANAGEMENT WITH THEIR REPAIR PLANS
- HAVE BEEN WORKING WITH LNG VESSEL CAPTAIN & MANAGEMENT, LOCAL & FEDERAL REGULATORS
(([email protected];))
- Forums
- ASX - By Stock
- ORG
- News: ORG Conocophillips Australia Says Confirm LNG Vessel Docked At APLNG Facility Lost Power
ORG
origin energy limited
Add to My Watchlist
0.51%
!
$11.94

News: ORG Conocophillips Australia Says Confirm LNG Vessel Docked At APLNG Facility Lost Power
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
$11.94 |
Change
0.060(0.51%) |
Mkt cap ! $20.56B |
Open | High | Low | Value | Volume |
$11.83 | $11.94 | $11.75 | $16.28M | 1.366M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 681 | $11.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$11.95 | 3729 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2 | 11.850 |
1 | 844 | 11.810 |
1 | 700 | 11.800 |
1 | 800 | 11.710 |
2 | 525 | 11.700 |
Price($) | Vol. | No. |
---|---|---|
11.950 | 3729 | 1 |
11.990 | 6851 | 1 |
12.000 | 3980 | 3 |
12.020 | 1500 | 1 |
12.050 | 1194 | 2 |
Last trade - 16.10pm 08/08/2025 (20 minute delay) ? |
Featured News
ORG (ASX) Chart |