May 30 (Reuters) - PO Valley Energy Ltd (PVE) :
- Plans to perforate level c1 in our sillaro production field have been delayed
- Plans delayed due to failures in the contractor's perforation equipment.
- Contractor subsequently demobilised from site
- The contractor is expected to return in early June to complete the
perforation of the target zone
- Forums
- ASX - By Stock
- PVE
- News: PVE Po Valley Energy updates on Sillaro gas field
News: PVE Po Valley Energy updates on Sillaro gas field
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PVE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $40.56M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 369919 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 10000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 369919 | 0.031 |
2 | 200000 | 0.030 |
1 | 300000 | 0.028 |
1 | 62997 | 0.018 |
1 | 33334 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 10000 | 2 |
0.044 | 34651 | 1 |
0.045 | 115349 | 1 |
0.050 | 30716 | 2 |
0.055 | 100000 | 1 |
Last trade - 16.12pm 08/08/2024 (20 minute delay) ? |
Featured News
PVE (ASX) Chart |
Day chart unavailable