Additional test work has reduced Capex and Opex at South Boulder Mines’ Colluli Potash Project in Eritrea. It has completed the prefeasibility study preliminary process design, which confirmed a simple, proven and reliable process, can produce potassium sulphate with yields of more than 80%.
News: South Boulder Mines lowers OPEX and CAPEX at Colluli Potash Project
Add to My Watchlist
What is My Watchlist?