Achieving nameplate copper cathode production at the Kipoi Copper Project in the DRC within just 11 weeks of start-up is a strong result and highlights the operational ability of the Tiger team to achieve ahead of guidance. Tiger Resources is on target to reach its increased guidance of 14,000 tonnes of copper cathode in 2014. Shares should open stronger today.