Plus it looks like about 1000 jobs at Lng plant are going before Xmas at Darwin. Construction and plant needed way behind schedule.
- Forums
- ASX - By Stock
- News today from external sources
Plus it looks like about 1000 jobs at Lng plant are going before...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
Add XJO (ASX) to my watchlist
|
|||||
Last
7,943.2 |
Change
-171.500(2.11%) |
Mkt cap ! n/a |
Open | High | Low |
8,114.7 | 8,114.7 | 7,920.0 |
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
XJO (ASX) Chart |