April 27 (Reuters) - Viva Energy Group Ltd (VEA) :
- COMMENCED PREPARATIONS TO SHUT DOWN GEELONG REFINERY'S RESIDUAL CATALYTIC CRACKING UNIT
- EXPECTS REFINING INTAKE TO BE REDUCED TO ABOUT 2.5 MILLION BARRELS PER MONTH
- REFINERY'S MAIN CRUDE DISTILLATION UNIT & ALL OTHER PROCESSING UNITS WILL CONTINUE TO OPERATE
- EXPECTS NO DISRUPTION TO FUEL SUPPLY
- SHUT DOWN OF UNITS REQUIRED TO FURTHER REDUCE SURPLUS PRODUCTION & CONTINUE OPERATIONS
- REVIEWING PLANS FOR MAJOR MAINTENANCE TURNAROUND OF REFINERY'S RESIDUAL CATALYTIC CRACKING UNIT
- VIVA ENERGY- SHUT DOWN TO FURTHER REDUCE SURPLUS PRODUCTION & CONTINUE OPERATIONS SINCE FUEL DEMAND IS LOWER THAN NORMAL
April 27 (Reuters) - Viva Energy Group Ltd (VEA) : COMMENCED...
Add to My Watchlist
What is My Watchlist?