2 main sequences could be followed but if they do what they did in Snatcher 2 it is:
Drill through the target - slow down and control drill with shows.
Finish drilling well if a DST is not needed (i.e. the shows and results are mostly what is expected)
Run logs - get the logs analysed while geos update their cross sections and maps.
Finish information gathering in the well (side wall cores and seismic check shots are possible but I believe were not done in Snatcher 2)
*****This is where we are at*****
Most important decision - case or abandoned
Looking at the reports a cased well seems likely. The rig would go away (down to MHL/VPEs Fury-1 I believe) while VPE would prepare site for production and perforate with a wireline rig (timing unknown but a few weeks is normal).
- Forums
- ASX - By Stock
- ITC
- news
news, page-14
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)