    Still no news, so I re-post the info on the missing news below.

    There is nowhere to hide, you will have to release it at some point.

    Man-up and release the news.

    Your shareholders hold YOU responsible.

    It is totally unreasonable to keep playing this delay game, it is now September.

    Stop sitting on results and stop failing shareholders so miserably.



    No operational/drilling results news since June 27th.

    From the last ann:
    Balatindi
    Gold assay results are awaited for four diamond drill holes and multi-element assays for
    seven diamond drill holes.
    In addition to the check fire assay procedures already in place, the Company has instructed that a
    larger number of samples generated through random selection be subjected to fire assay by the
    laboratory.

    All samples from holes BLDD001 to BLDD008 and part of BLDD009 have been delivered to the Intertek
    Laboratory, Ghana. Most samples generated for holes BLDD009 and BLDD010 remain on site awaiting
    shipment to the laboratory. Burey has encountered additional problems with regards to effective shipment of
    the samples out of Guinea to the laboratory in Ghana and is in discussion with a number of carriers.

    Balatindi Radiometric Anomalism
    The five radiometrically anomalous prospect areas located by Burey?s prior ground radiometric survey of the
    Balatindi Licence have also been drill-tested using a program total of 22 RC drill-holes for 1,848 metres and
    seven HQ diamond drill follow-up holes for 746 metres.
    This program generated a further 2,126 RC and approximately 800 DD samples, for both BLEG and ICP MS
    analysis at Intertek Laboratory. All RC samples have been prepared and submitted to Intertek Laboratory.
    Cutting of the seven DD core has been completed, with the core now awaiting shipment to the laboratory.
    Again comprehensive logging has been completed and includes orientation, digital photography, structure,
    RQD, magnetic susceptibility, lithology, and natural gamma emission count of all holes. Data entry is being
    completed as quickly as possible and summary logs of all holes will be completed following this.

    Mansounia
    37 infill and extension holes for 3,800 metres drilled to date at the Mansounia Project. Drilling is
    expected to be completed by the end of this month, culminating with work on the Magnificent
    Prospect.

    Mansounia Infill and Extension Drilling
    Whilst a shortage of diesel fuel in Guinea has hampered the drilling program at Mansounia, progress has
    nevertheless been made with 37 inclined infill RC holes completed for approximately 3,800 RC samples. All
    RC assay samples have been split and are currently in storage in Kankan, with approximately 22 tonnes
    awaiting on-shipment to Intertek Laboratory in Tarkwa, Ghana where they will be assayed for gold.

    Kossanke and Celein Projects
    Field crews from a contractor, SEMS Exploration, are on site at the Farassababen Field Camp on the
    Kossanke property after extensive refurbishment of roofing, electric and water reticulation and drilling of a
    potable water-bore. SEMS is currently organising labour for a comprehensive 1km spaced E-W aligned 50m
    spaced soil sampling program. It will generate approximately 3,300 and 1,100 composite soil samples from
    the Kossanke and Celein properties respectively over the next six weeks.

    So, where the hell are the results???
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.