Andy if you go back and read one of my previous posts you will find that I informed you that the well was not cleaning up as they would have liked and that they were building up pressure not only to take the readings to gauge the time for the pressure to re establish itself but to then release the pressure to assist with the evacuating of the fraccing fluid up the pipe. The announcement you quote tells you that the pipe size was an issue in that the fluid was able to escape past the gas before it was ejected from the well. The announcement commented that they were considering placement of a smaller diametre tube to assist with the cleanup.
Doing research means that you need to understand what is happening and to take notice of all the posters here as it is amazing just what you can learn.
NWE Price at posting:
3.5¢ Sentiment: Buy Disclosure: Held